{ "culture": "en-AU", "name": "", "guid": "", "catalogPath": "", "snippet": "The Billabong Creek Floodplain boundary delineates the area to which the Floodplain Management Plan for the Billabong Creek Floodplain 2026 applies. The area within the boundary is declared to be a floodplain under the Water Management (General) Regulation 2025.", "description": "
The Billabong Creek Floodplain boundary delineates the area to which the Floodplain Management Plan for the Billabong Creek Floodplain 2026 applies. The area within the boundary is declared to be a floodplain under the Water Management (General) Regulation 2025.<\/SPAN><\/SPAN><\/P> The floodplain is 6934 km2 in area and extends downstream from Walbundrie in the east to the junction of Billabong Creek and the NSW Murray Valley Floodplain at Moulamein, and includes the area within the repealed localised FMP and associated floodplain. The floodplain boundary includes the southern end of the Yanco Creek system from Kidman Way.<\/SPAN><\/SPAN><\/P> The floodplain connects with the floodplain boundaries for the Murrumbidgee and NSW Murray valley floodplains improving the assessment of cumulative impacts from individual flood works across the Murray\u2013Darling Basin.<\/SPAN><\/SPAN><\/P> A combination of hydraulic and administrative factors, where appropriate, have been used to develop the floodplain boundary including: <\/SPAN><\/SPAN><\/P> \u2022 inundation data within the Murrumbidgee catchment <\/SPAN><\/SPAN><\/P> \u2022 hydraulic model development <\/SPAN><\/SPAN><\/P> \u2022 the previous localised Billabong Creek FMP<\/SPAN><\/SPAN><\/P> \u2022 water source boundaries, as established in water sharing plans <\/SPAN><\/SPAN><\/P> \u2022 local government areas <\/SPAN><\/SPAN><\/P> \u2022 major roads and railways which act as barriers to large scale flood movement.<\/SPAN><\/P><\/DIV>",
"summary": "The Billabong Creek Floodplain boundary delineates the area to which the Floodplain Management Plan for the Billabong Creek Floodplain 2026 applies. The area within the boundary is declared to be a floodplain under the Water Management (General) Regulation 2025.",
"title": "In-Force Billabong Creek Floodplain Management Plan Boundary",
"tags": [
"NSW DCCEEW",
"Water Group",
"FMP",
"Floodplain Management Plan",
"Floodplain Boundary"
],
"type": "",
"typeKeywords": [],
"thumbnail": "",
"url": "",
"minScale": 5000000,
"maxScale": 5000,
"spatialReference": "",
"accessInformation": "NSW Department of Climate Change, Energy, the Environment and Water - Water Group",
"licenseInfo": " PLEASE NOTE: In the case of any discrepancy between this digital dataset and the published Floodplain Management Plan (accessible on the department\u2019s website) the instrument as made by the Minister remains the authoritative source and should be used to both interpret the intent of the Plan and in subsequent decision making. Best endeavours have been made in collating relevant Floodplain Management Plan boundary and attribution contained in this dataset. However, no warranty is provided as to the accuracy or currency of this representation. The department does not warrant and is not liable for the use of this material as per the licenced sharing conditions CC-BY 4.0.<\/SPAN><\/P><\/DIV><\/DIV><\/DIV><\/DIV>",
"portalUrl": ""
}